FAQ
How long does the measurement take?
A measurement takes about 90 minutes to complete.
Should I prepare anything before you come?
When and how do I get the drawing?
Usually later the same day or the day after by email. We send drawings in CAD and PDF format.
What will be included in the drawing?
Walls, doors, windows, drains, ventilation, and electrical outlets. If you wish to include something extra, such as radiators or window sills, we will add it to the drawing afterward.